Stringing Guide

L& Big t CONSTRUCTION

ELECTRICITY TRANSMISSION & DISTRIBUTION

4 hundred KV DCDS RJTL

DIRECTORY FOR CAUDILLO STRINGING

Section:

Date:

Number

Description of Activity

Feedb

ack

1

All motorists and herb operators happen to be holding the valid

driving license.

Check the allow has been from the

Skilled Authority pertaining to stringing of conductor while

crossing through Road as well as Rail as well as River/ Weak

areas etc . (Where necessary)

Check that all of the safety measures have been taken

during string of conductor traversing the EHV/HV/LT

lines (Earthing of existing lines)

Assure proper scale nuts and bolts will be rigidly

stiffened and punching / tacking / tack welding is

done in towers before executing stringing job.

Ensure right scaffolding agreements made during

stringing of conductor (While Road Crossing / Electrical power

line Bridging etc .

Make sure that all associates are fitted in tower just before

undertaking director stringing work

Check that the spine filling with the foundation has become

done according to specification.

Stringing machine as well as Tension puller machine is definitely

properly earthed.

Check the brake arrangement from the TSE Equipment is

operating

Ensure that the pulleys applied before conductor

stringing can be been inspected for sufficient strength /

proper size(diameter), also in case of open type

pulleys right locking arrangements like rendering of

Security pin is done. Ensure for copy of test certificate

for all the training machines and tackles.

Ensure the ropes used ahead of conductor stringing has

been checked intended for adequate durability / physical

condition (Free from break of hair strands and knots etc . )

Yes as well as

No

Certainly /

Simply no

2

four

5

six

7

8

9

12

11

doze

Yes /

No

Yes /

Zero

Yes as well as

No

Yes /

Simply no

Yes /

No

Certainly /

Not any

Yes /

No

Yes /

Zero

Yes as well as

No

Comments

13 Make sure that the working out with tools and tackles we. e. Winch

machine, String Pulley Stop, Trifor, D-Shackle etc .

are in healthier condition and has been analyzed

periodically. \

14 Check for the braking system arrangement of...